Drop continue-on-error from the Performance journeys job (plan item B3).
All 71 master runs from 2026-10-06 to 2026-10-12 passed the journey
counter check with the baselines of their own commit, and no enforced
counter differed between the measured iterations of a run.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>